Texas Hobbit House

Texas Hobbit House

  • Home
  • Structure
  • Dig, Dig, Dig
  • Interior Ideas
  • Calendar
  • Foundation
  • Gifted and Bought Items
  • PROGRESS!!
  • Patio/utility
  • The DOOR
  • More
    • Home
    • Structure
    • Dig, Dig, Dig
    • Interior Ideas
    • Calendar
    • Foundation
    • Gifted and Bought Items
    • PROGRESS!!
    • Patio/utility
    • The DOOR
✕
  • Home
  • Structure
  • Dig, Dig, Dig
  • Interior Ideas
  • Calendar
  • Foundation
  • Gifted and Bought Items
  • PROGRESS!!
  • Patio/utility
  • The DOOR

Foundation - prep and cement

I know, looks like a volleyball court layout!

  • I know, looks like a volleyball court layout!
  • This is hard work.  Raul and Alvarro (A B Concrete) work hard!
  • The plastic is for vapor protection, and lots or rebar for the block walls (which hold the, uh, roof up!)
  • Here comes the floor!
  • and more floor...I'm amazed at how these guys handled everything!
  • Forms removed.  There is an 8" perimeter wall built into this pour.  This is a little more protection against water - no seam at concrete wall.
  • Sitting out there this morning, looking at the polished floor.  Bent rebar opening will be from living room to bedroom entrance way.
Copyright © 2017 Texas Hobbit House - All Rights Reserved.
Powered by GoDaddy GoCentral Website Builder